Friday 17 February 2012

Cabin sneak preview..

This is the drawing, pls note, we had to use driver cab for 
the electronic circuits/battery, for easy access..
more details DECAL will come..



Tuesday 7 February 2012

Near completion...

The CNY holiday is longer than i thought...many places still close and not much of progress for last 2 weeks..here are some final re-arrangement of main cabin and final touch..(cabin cover will be ready soon..)
The 4mm X 6mm nilon hoses are now taking shape on the top of main boom, with one piece bracket
holding them togather..
 Main hyd cylinder are now been installed with the right ones (SMC 20-125)..plus the bracket at the bottom to hold all 4 lines
Main control valve is now at final location, compact and neat arrangement, pls note the Al bracket to hold
all the servos to control the spool valve for the arm..